Send a scheduled report once on demand to distribution list

  • On occasion my scheduled reports don't get sent out because of server issues. Is there a way to send the report out to the distribution list, once. My work around is changing the scheduled time, let it run, then change the time back. Any thoughts?

  • Do you have access to the SQL Agent where the ReportServer database is stored?

    If so you could just find the job with the GUID for your subscription in question and run the job once the issues have resolved.

  • I do have access. Thanx.

Viewing 3 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic. Login to reply