February 24, 2017 at 2:00 am
Hi,
In one of my prodcution sql server 2014 server i have Log shipping jobs running along other jobs also scheduled
when i go to check particular job history it shows only one day old but i want to maintain all the jobs history at least 15-30 days for each job
how much values need to change in agent job properties history?
Thanks in advance
Please suggest solution
I
February 24, 2017 at 2:12 am
Tick Remove agent history and set to to Older than: 1 Month(s). Then either untick Limit size of job history log, or make sure than the numbers of rows per job is high enough for the frequency of your most frequent job, and that the overall job history log size is high enough to hold the history for all of your jobs for the desire time period.
John
February 24, 2017 at 2:21 am
Hi Thanks for reply,
currently i have changed the default 1000 & 100 to below
15000 & 15000 but still hystory of each job shows one day old
Please suggest
Thanks in advance
February 24, 2017 at 2:27 am
Now you just have to sit and wait. If that job history wasn't there before, it won't be now, just because you've changed the number of rows to retain. If you've chosen your numbers of rows correctly (and I've a feeling you're just guessing, since you've set the overall number the same as the per-job number) then after 15-30 days, you should be able to see all the job history you want.